
Case Study: Volkswagen Huntingdon — Hydra Dion 30 kW Installation
Client: Volkswagen Huntingdon
Partner: LCS Energy
Hardware: Hydra Dion DC Charger
Power: 30 kW
Scope: Design, installation, commissioning, and aftercare
Project Overview
At Volkswagen Huntingdon, Hydra EVC deployed a 30 kW Hydra Dion DC charger to enhance dealership efficiency and customer experience.
Planned, installed, and commissioned in partnership with LCS Energy, the project delivered a clean, low-impact fit positioned conveniently within customer flow — preserving forecourt space while enabling quick top-ups for demo cars, service vehicles, and visitor EVs.
Our Approach
-
Conducted site survey and load assessment
-
LCS Energy installed dedicated supply, compliant protection, and tidy containment
-
Hydra EVC performed electrical and functional checks, firmware/config validation, and commissioning
-
Provided a simple handover for dealership staff
-
Added clear wayfinding and bay marking for intuitive use
-
Implemented a light aftercare plan with system health monitoring, alerts, and periodic checks
Results
✅ Fast, reliable charging for daily dealership operations
✅ Preserved forecourt space with a compact charger footprint
✅ Improved operational flow for test drives, servicing, and handovers
✅ Scalable setup ready for future charging expansion
Outcome
The Hydra Dion installation at Volkswagen Huntingdon demonstrates Hydra EVC’s ability to deliver professional, space-efficient, and future-ready charging solutions for the automotive sector — ensuring uptime, efficiency, and seamless integration with on-site operations, expertly installed by our partners at LCS Energy.

